Change Change Detail Date
Web Site Update Added new feed from FIA Ranch private weather station 12/11/11
File Updates Added new & updated drawings to Contractor Area 07/10/11
File Updates Added new & updated drawings to Contractor Area 07/05/11
File Updates Added all new building plans and drawings to Contractor Area 05/01/11
File Updates Removed all building plans and drawings 11/01/08
Web Site Update Added a second video test stream 10/25/08
File Updates Update Communications Network Drawings and Files 10/08/08
Web Site Updates Removed chat room from site 03/01/07
Web Site Updates Added a simple chat room to the site 12/20/06
Web Site Updates Update Storage Building & Map Files In Contractor Area 11/06/06
Web Site Updates Update Pump House Control Specifications 10/19/06
Web Site Updates Update Pump House Control Specifications 08/01/06
Web Site Updates Add Main Out Building CAD to Contractor Area 07/14/06
Web Site Updates Update Location Maps In Contractor Area 07/13/06
Web Site Updates Update Pump House Control Specifications 07/11/06
Web Site Updates Added a scenes and scenery slide show back into the site 06/27/06
Web Site Updates Update several pages and areas of the site including navigation, files access, etc. 03/24/06
Web Site Updates Published wire tag naming and numbering, and wire color coding standards for contractors to follow for all phases of the project. 02/21/06
Pump House Finalized the design specifications documents for the Pump House PLC, updated the pump house electrical drawings, and updated the communications and control system drawings. 12/30/05
Web Site Updates Added/modified several website files, pages, and navigation. 12/16/05
Main Out Building Added preliminary design documents for the Main Out Building on the main building site. 12/13/05
Web Site Change Intro Page, Remove Chat System 12/05/05
Work Plan Update current status of several Work Plan items 12/04/05
Web Site Add "Max View Capability" for low resolution/small monitors 11/24/05
  Maps Added Aerial Photo Map of Ranch Location 11/15/05
  Main Gate Completed Gate Operation and Control Drawings 09/19/05
  Construction Specifications Updated Construction Specifications Document 09/03/05
Storage Bldg. Completed plans for storage building loft 08/05/05
Web Site Install Chat System 08/02/05
  Web Site Install New Menu System 03/04/05
Electrical System Update pump house schematics in electrical system section 10/05/04
Electrical System Add pump house schematics to electrical system section 09/21/04
  Water System Change the  Domestic Hot Water System to a tankless system with associated valving.  07/07/04
  Main Gate Completed the Gate Design & Specifications 06/21/04
  Web Site Change Streaming Video Software 05/23/04
Communications and Control System Revise Communications & Control System Drawings 04/29/04
  Weather Added Spring Storm Round Two Pictures 04/23/04
  Web Site Add Streaming Video Page to begin testing 04/22/04
  Web Site Turn on automail for e-mail notification, restructure website. 04/14/04
  Construction Specifications Updated Construction Specifications Document 04/12/04
  Web Site Added E-Mail Registration Page 04/11/04
  Web Site Added Progress Reports Page for those wishing to sing along! 04/10/04
  Weather Picture page of spring storm April 3-4, 2004 04/04/04
  CAD Files Upload finalized architect CAD file 03/26/04
Communications and Control System Post preliminary communications and control system design file 02/15/04
Overall Design Post final floor plans and elevations.  Upload CAD files 01/11/04
Electrical System Updated lightning protection system design 01/08/04
Water System Updated water system CAD with lightning protection and grounding 01/03/04
Download Drawing Files Updated several download drawing files 12/21/03
Update Work Plan Update status of several work plan items 12/21/03
Construction Specifications Updated several sections of the Constructions Specifications Document 12/20/03
  CAD Files Completely revised / updated Water System Overall Design Drawings Package 11/25/03
Info Page Update Completed Building Site Prep 11/02/03
Info Page Update Updated the weather information page. 10/26/03
 

Major Contract Awarded

We have awarded a major contract on the project to Clear Lighting and Electrical Design, Inc.  They are a design / engineering firm in Vail, Colorado.  They will be doing all the design and specifications for the electrical systems, back-up power systems, lighting design, lighting fixture specifications, security system, audio/video system, data and voice networks, and an overall home technology integration plan.  There is a link to their site on the Contractors Access Page. 10/13/03
CAD Drawings Update CAD drawings accessed by Contractors 09/16/03
Construction Specs Updated Construction Specs for wall SIP cladding 09/06/03
Work Plan Update current status of several Work Plan items 09/05/03
This Page Create this what's new page to simplify updates 08/14/03