Time
To Take A Break! So A Short Week.
 Set
buried drain valve box and make water line connections. White conduits on
side go into pump house. Ready for valves,
water lines, and valve control wire into pump house.
 Starting
to life pump house onto pad.
 Done!
 Pump
house set.
 Inside
view of rear of pump house setting on pad. Cistern collar and
communications/control conduits in right-rear.
 Left
to right: Ground lead from concrete reinforcing wire, ground lead
conduit out to ground system, two (one spare) well monitor conduits to well casing, two
(one spare) well power conduits to well casing.
 Two
large conduits (one spare) are for power cable from main power
distribution. Small conduit
for lightning protection down-lead from air terminal on roof.
 Adding
two feet of casing to well head providing additional ground clearance for
junction boxes which will be attached there. Good thing there will be a gas
vent in the well cap!
On
tap: After Memorial Day weekend, continue trenching to main building
site.
|